Duplication of the East Point effluent rising main and extension of the East Point outfall : guidelines for preparation of a public environmental report
Details:
Title
Duplication of the East Point effluent rising main and extension of the East Point outfall : guidelines for preparation of a public environmental report,
Other title
Power and Water Corporation,
Issued by
Northern Territory. Power and Water Corporation,
Collection
E-Publications,
E-Books,
PublicationNT,
Date
2010-02-01,
Location
East Point,
Darwin Harbour,
Notes
Cover title.,
Made available via the Publications (Legal Deposit) Act 2004 (NT).,
Table of contents
1. Introduction To The Guidelines -- 2. General Advice On The Per -- 2.1 General Content -- 2.2 Format And Style -- 2.3 Administration -- 3 General Information -- 4 Description Of The Proposal -- 4.1 General -- 4.2 Construction Phase -- 4.3 Operation Phase -- 5 Alternatives -- 6 Risk Assessment -- 6.1 Risk Assessment Approach -- 7 Key Risks -- 7.1 Disturbance To Marine And Terrestrial Soils And Sediments -- 7.2 Water Quality During Operation Of The East Point Outfall 7.3 Natural Disasters -- 8 Proposed Project Environmental Management -- 9 Public Involvement And Consultation.,