East Arm Port alternative development. Geotechnical investigation for Stage 1A construction 15 additional probes - November 94
Details:
Title
East Arm Port alternative development. Geotechnical investigation for Stage 1A construction 15 additional probes - November 94,
Other title
Geotechnical investigation for Stage 1A construction East Arm Port,
Creator
Acer Vaughan,
Issued by
Northern Territory Construction Agency,
Collection
E-Publications,
E-Books,
PublicationNT,
T/R35/94,
Date
1994-12-01,
Location
East Arm Port,
Description
"Acer Vaughan was commissioned by the Northern Territory Construction Agency on the 10th of November 1994 to carry out additional over water probing of sediments at the proposed alternative site of the East Arm Port
facility. The information from this additional probing was required for design purposes." - Introduction,
Made available via the Publications (Legal Deposit) Act 2004 (NT).,
Notes
Prepared for: Department of Transport and Works Construction Agency,
Made available via the Publications (Legal Deposit) Act 2004 (NT).,
Table of contents
Introduction -- Scope of work -- Method of investigation -- Investigation findings -- Recommendations -- References. Tables 1-4 - Figures - Appendices A-F,
Language
English,
Subject
Darwin,
Engineering geology,
East Arm Port,
Harbors -- Northern Territory -- Darwin,
Harbors,
Engineering geology -- Northern Territory -- East Arm Port,
Northern Territory,