Territory Stories
Stuart Highway CH: 92.4 - 93.75km - Geotechnical investigation
Details:
Title
Stuart Highway CH: 92.4 - 93.75km - Geotechnical investigation,
Other title
Pavement investigation Stuart Highway Ch: 92.4 - 93.75 km,
Creator
Douglas Partners Pty Ltd,
Commissioned by
Northern Territory. Department of Infrastructure, Planning and Environment,
Collection
E-Publications,
E-Books,
PublicationNT,
Technical Report TR 08/05,
Project 67021A,
Date
2005-04-06,
Abstract
This factual report details the results of the geotechnical investigation carried out on the existing pavement at Chainage 92.4 to 93.75km Stuart Highway, Northern Territory. The investigation comprised the excavation, logging and photography of four test pits (TP1 to TP4), supplemented by in-situ testing and laboratory testing on selected samples retained from the pits. Details of the field work and testing are given in this report.,
Notes
Made available via the Publications (Legal Deposit) Act 2004 (NT).,
Table of contents
Introduction -- Site description -- Fieldwork -- Laboratory testing -- Appendix A-B,
Language
English,
Subject
Geotechnical investigation,
Soil profile,
Soil analysis,
Subsurface conditions,
Test pits,
Roadworks,
Publisher name
Douglas Partners Pty Ltd,
Place of publication
Winnellie,
Series
Technical Report TR 08/05,
Project 67021A,
Format
1 volume (various pagings) : colour illustrations, tables ; 30 cm,
File type
application/pdf,
Use
Attribution International 4.0 (CC BY 4.0),
Copyright owner
Northern Territory Government and Douglas Partners Pty Ltd,
License
https://creativecommons.org/licenses/by/4.0 ,
Parent handle
https://hdl.handle.net/10070/268259 ,
Citation address
https://hdl.handle.net/10070/438592
Territory Stories
Stuart Highway CH: 92.4 - 93.75km - Geotechnical investigation
Details:
Title
Stuart Highway CH: 92.4 - 93.75km - Geotechnical investigation,
Other title
Pavement investigation Stuart Highway Ch: 92.4 - 93.75 km,
Creator
Douglas Partners Pty Ltd,
Commissioned by
Northern Territory. Department of Infrastructure, Planning and Environment,
Collection
E-Publications,
E-Books,
PublicationNT,
Technical Report TR 08/05,
Project 67021A,
Date
2005-04-06,
Abstract
This factual report details the results of the geotechnical investigation carried out on the existing pavement at Chainage 92.4 to 93.75km Stuart Highway, Northern Territory. The investigation comprised the excavation, logging and photography of four test pits (TP1 to TP4), supplemented by in-situ testing and laboratory testing on selected samples retained from the pits. Details of the field work and testing are given in this report.,
Notes
Made available via the Publications (Legal Deposit) Act 2004 (NT).,
Table of contents
Introduction -- Site description -- Fieldwork -- Laboratory testing -- Appendix A-B,
Language
English,
Subject
Geotechnical investigation,
Soil profile,
Soil analysis,
Subsurface conditions,
Test pits,
Roadworks,
Publisher name
Douglas Partners Pty Ltd,
Place of publication
Winnellie,
Series
Technical Report TR 08/05,
Project 67021A,
Format
1 volume (various pagings) : colour illustrations, tables ; 30 cm,
File type
application/pdf,
Use
Attribution International 4.0 (CC BY 4.0),
Copyright owner
Northern Territory Government and Douglas Partners Pty Ltd,
License
https://creativecommons.org/licenses/by/4.0 ,
Parent handle
https://hdl.handle.net/10070/268259 ,
Citation address
https://hdl.handle.net/10070/438592